Regional News

Metro works worth Rs1.16 lakh-crore on in Mumbai region: Devendra Fadnavis

Mumbai: Metro works of more than Rs1.16 lakh crore are underway in Mumbai and the Mumbai Metropolitan Region (MMR), Maharashtra Chief Minister Devendra Fadnavis told the Legislative Assembly on Friday. Replying to debate on urban development, he also noted that the area under the Mumbai Metropolitan Region Development Authority (MMRDA) has been expanded from 3,965 sq km to 4,355 sq km. “More than Rs 1.16 lakh crore metro works are underway in Mumbai and MMR. Metro 3 will be operational in two phases in 2021 and 2022,” Fadnavis said. Mumbai Trans Harbour Link, which will connect east Mumbai with Nhava-Sheva across the creek, is another major project and the work on it is progressing in full swing, he said.

Planning agencies catering to the Mumbai region including the MMRDA, CIDCO are getting loans at low interest rates, the chief minister said. Surya Water Supply Scheme will ensure water supply of 403 million litres per day to the MMR, he said. The Damanganga-Pinjal project will meet Mumbai’s water needs till 2060, Fadnavis added. The work on Dr Babasaheb Ambedkar’s memorial at Indu Mills land in Mumbai is going on in full swing, and it will be completed by December 6, 2020, Fadnavis said. “We are working on a hybrid metro system for Nashik city. Detailed Project Report (DPR) is ready. It is easily convertible into metro. There is a huge cost difference between the two. Hybrid metro costs around Rs50 crore per km and regular metro costs Rs275 crore per km,” he said.

As to the coastal road project in Mumbai, Fadnavis assured that not a single Koliwada (fisherfolk’s settlements) will be affected by it. A common Development Control Regulation for MMR region is in final stages. Survey for redevelopment of BDD chawls in Mumbai is also near completion and it will be one of the biggest redevelopment projects in Asia, the Chief Minister claimed.

28 Comments

28 Comments

  1. Pingback: 바카라사이트

  2. Pingback: شات بدون تسجيل دخول

  3. Pingback: Whois Lookup

  4. Pingback: replica seamaster chronometer

  5. Pingback: british dragon turinabol

  6. Pingback: french bulldog puppies for sale near me in USA Canada Uk Australia Europe cheap

  7. Pingback: blazing trader review

  8. Pingback: porn movie

  9. Pingback: Harold Jahn Alberta

  10. Pingback: Auto Glass Anytime

  11. Pingback: regression testing

  12. Pingback: rolex replica

  13. Pingback: Urban Nido Hyderabad Real Estate

  14. Pingback: microsoft exchange mail

  15. Pingback: click here

  16. Pingback: Voiko Harrastaa Seksiä Kondylooma Hoidon Aikana

  17. Pingback: คาสิโนออนไลน์

  18. Pingback: sbo

  19. Pingback: Chillwell AC reviews

  20. Pingback: sbobet

  21. Pingback: Devops service providers

  22. Pingback: sbo

  23. Pingback: magic mushroom chocolate bars denver

  24. Pingback: สินเชื่อโฉนดที่ดินเปล่า

  25. Pingback: molly drug mri brain,

  26. Pingback: Buy DMT Vape Pen Brisbane

  27. Pingback: look at here now

  28. Pingback: Ventilatoare centrifugale - inalta presiune

Leave a Reply

Your email address will not be published.

12 + 11 =

News is information about current events. News is provided through many different media: word of mouth, printing, postal systems, broadcasting, electronic communication, and also on the testimony of observers and witnesses to events. It is also used as a platform to manufacture opinion for the population.

Contact Info

Address:
D 601  Riddhi Sidhi CHSL
Unnant Nagar Road 2
Kamaraj Nagar, Goreagaon West
Mumbai 400062 .

Email Id: [email protected]

West Bengal

Eastern Regional Office
Indsamachar Digital Media
Siddha Gibson 1,
Gibson Lane, 1st floor, R. No. 114,
Kolkata – 700069.
West Bengal.

Office Address

251 B-Wing,First Floor,
Orchard Corporate Park, Royal Palms,
Arey Road, Goreagon East,
Mumbai – 400065.

Download Our Mobile App

IndSamachar Android App IndSamachar IOS App
To Top
WhatsApp WhatsApp us