Mumbai: The Brihanmumbai Municipal Corporation (BMC) will repair six dilapidated bridges in the eastern suburban at a cost of Rs8 crore.
After the collapse of the Himalaya foot overbridge, the municipal corporation’s bridges department had conducted the structural audit of the city’s bridges.
Based on the structural audit report, the bridges found to be dangerous for use were to be repaired. Six bridges in the eastern suburban will be repaired at Rs7,79,14,000. Some bridges, which were in dilapidated condition, were closed for public use immediately after the Gokhale and Himalaya FOB collapses.
On the advice of the Structural Designers and Consultants, the bridges at Ghatkopar, Vikhroli, Powai and Mulund will be repaired by the API Civilcon Pvt Ltd. The expected time to complete the construction is 18 months, excluding the monsoon months.
Pingback: ignou report
Pingback: How To Use Wealthy Affiliate 2020
Pingback: cach vao 12 bet
Pingback: buy Raspberry Macaroons 200mg Cookies Edibles online use for pain, anxiety, sleep for sale near me bulk in usa uk nz canada australia overnight delivery
Pingback: blazing trader review
Pingback: devops
Pingback: rolex replica
Pingback: rolex replica
Pingback: wigs for women
Pingback: duplicate rolex
Pingback: link
Pingback: villas in sale in Hyderabad
Pingback: uk cvv fullz
Pingback: best cvv bins
Pingback: sbobet
Pingback: buy weed Florida
Pingback: สล็อต
Pingback: sbo
Pingback: buy stoeger guns
Pingback: Hidden Wiki
Pingback: where to get psilocybin colorado
Pingback: Changa DMT For Sale Melbourne
Pingback: informática lisboa
Pingback: Dave Bolno
Pingback: 토렌트 다운
Pingback: pgslot
Pingback: ai nude