Regional News

In 3 hours, 800 vehicles speed over 140 kmph on Delhi-Meerut Expressway

During a recent survey to check speed of vehicles plying on the existing stretches of the Delhi-Meerut Expressway (DME), officials of the National Highways Authority of India (NHAI) found at least 800 vehicles, mostly cars and SUVs, running at 140 kilometres per hour (kmph) or above, all in a three-hour span.

The finding has officials worried as they ready to start operations on the 22km-long phase 3 (Dasna-to-Hapur) stretch of the Delhi-Meerut Expressway (DME) by August- end.

According to officials, the test was conducted at the 5km elevated section of the DME near Pilkhuwa (going towards Hapur), where about 3,600 passenger car units (PCU) were checked every hour for about three hours. The highway has frequency of about 60,000 PCUs per day.

“We found that out of about 10,800 vehicles on up and down lanes during the three-hour span, nearly 800 vehicles were speeding. Their speed was found to be 140kmph or above. This has raised concerns and we are now planning to install speed radars, like the ones which are to be installed at the other stretches (phases 2 and 4) of the project,” said RP Singh, project director, NHAI.

“The phase 3 of the DME is likely to be completed by August-end and it will take another one-to-two months for installing the devices. After assessing the speed test report, we have decided to write to the traffic police to check and curb speeding as installation of speed detectors will take time,” he said.

Apart from these, NHAI officials said they have also planned to install accident detection cameras at about 40 identified critical junctions under the DME project.

Officials said they will initially keep the speed limit to 100kmph on the expressway. The permissible limit for expressways in the country is 120 kmph while for national highways, the maximum speed limit for cars is 100 kmph in rural areas and 70 kmph in urban areas.

The phase 3 has 10 highway lanes to take commuters to Pilkhuwa, Hapur and further towards Moradabad. The stretch has a 5km-long elevated section bypassing Pilkhuwa and another 2.5km-long elevated section to take commuters from Masuri to the other side of the Upper Ganga Canal, towards Hapur.

The other DME stretch being worked upon is the 19.28 km stretch (UP Gate to Dasna) under phase 2. The stretch is likely to be opened by December this year.

“We have planned to install speed radars and detection systems at Pratap Vihar and Bamheta locations under phase 2 while some have been planned under phase 4 (Dasna to Meerut) at the km 35 milestone (3km ahead of the Eastern Peripheral Expressway’s Dasna interchange) and the km 52 milestone at Jainuddinpur,” Singh added.

29 Comments

29 Comments

  1. Pingback: 카지노사이트

  2. Pingback: replica lancaster watches

  3. Pingback: CBD Cream

  4. Pingback: เงินด่วน ได้จริง

  5. Pingback: uniccshop.bazar

  6. Pingback: bitcoin era review 2020

  7. Pingback: Agile DevOps

  8. Pingback: Regression Testing Meaning

  9. Pingback: How Fun

  10. Pingback: Rescue Tow Newark CA

  11. Pingback: Digital transformation solutions

  12. Pingback: buy dumps with pin 2021

  13. Pingback: 풀팟포커

  14. Pingback: Handyman services

  15. Pingback: Independent Villas for Sale in Hyderabad

  16. Pingback: dumps with pin 101

  17. Pingback: 먹튀검증

  18. Pingback: toystore cc

  19. Pingback: china rolex watches

  20. Pingback: nova88

  21. Pingback: sbo

  22. Pingback: testosteron test apoteket

  23. Pingback: 이천속눈썹펌

  24. Pingback: to learn more

  25. Pingback: 홀덤

  26. Pingback: Cheap DMT for sale Australia

  27. Pingback: Golden Teacher Mushrooms for sale Sydney

  28. Pingback: Golden Teacher Mushrooms shop Toronto

  29. Pingback: 티비위키

Leave a Reply

Your email address will not be published.

5 × three =

News is information about current events. News is provided through many different media: word of mouth, printing, postal systems, broadcasting, electronic communication, and also on the testimony of observers and witnesses to events. It is also used as a platform to manufacture opinion for the population.

Contact Info

Address:
D 601  Riddhi Sidhi CHSL
Unnant Nagar Road 2
Kamaraj Nagar, Goreagaon West
Mumbai 400062 .

Email Id: [email protected]

West Bengal

Eastern Regional Office
Indsamachar Digital Media
Siddha Gibson 1,
Gibson Lane, 1st floor, R. No. 114,
Kolkata – 700069.
West Bengal.

Office Address

251 B-Wing,First Floor,
Orchard Corporate Park, Royal Palms,
Arey Road, Goreagon East,
Mumbai – 400065.

Download Our Mobile App

IndSamachar Android App IndSamachar IOS App
To Top
WhatsApp WhatsApp us