Tech

NASA has added the robotic toolkit to its Mars 2020 rover

NASA has added the robotic toolkit to its Mars 2020 rover – The Indian Express

In this August 5, 2019 image, the bit carousel – the heart of sampling and caching subsystem of NASA’s Mars 2020 mission – is attached to the front end of the rover. NASA has incorporated the bit carousel containing all of the tools the coring drill uses to sample the Martian surface into the Mars 2020 rover. It is a mechanism that will play a key role in the acquisition, containment and eventual return to Earth of humanity’s first samples from another planet, NASA said.

Mars 2020 will land on Jezero Crater on February 18, 2021. JPL’s John McNamee, project manager of Mars 2020 said that the bit carousel was the last piece of the Mars 2020 rover’s Sample Caching System to be installed. The carousel is a gateway for the Martian samples to move into the rover for assessment and processing and it contains all of the tools the coring drill uses to take the samples.

NASA will use Mars 2020 and other missions, including to the Moon, to prepare for human exploration of the Red Planet. As of now, “months of evaluation and fine-tuning lie ahead to make absolutely certain this rover is on the launch pad and ready to go on July 17, 2020,” McNamee said. JPL is building and will manage operations of the Mars 2020 rover for the NASA Science Mission Directorate at the agency’s headquarters.

NASA says that the bit carousel of Mars 2020 rover looks like an extraterrestrial version of a 1960s slide projector. It carries nine drill bits that will facilitate sample acquisition and surface analysis. Two drills bits are for abrading, one is for regolith (rock and soil) and remaining six are for coring. The coring and regolith bits are used to place Martian samples in a clean sample collection tube, while the abrader bit is used to scrape the top layers of rocks to expose un-weathered surfaces for study.

Engineers at NASA’s JPL lift the Mars 2020 rover’s bit carousel from its storage container. The bit carousel is at the heart of the rover’s Sample Caching System. “The bit carousel is at the heart of the sampling and caching subsystem,” said Keith Rosette, Mars 2020 sample handling delivery manager at NASA’s Jet Propulsion Laboratory in Pasadena, California. “It contains all of the tools the coring drill uses to sample the Martian surface and is the gateway for the samples to move into the rover for assessment and processing.”

The bit carousel comes into action as soon as the Mars 2020 rover gets ready to drill on the Martian surface. “If, for instance, the goal is to abrade, the carousel manoeuvres the appropriate bit into position so that the drill at the end of the rover’s robotic arm can extract it. Once the drilling is done, the bit goes back into the carousel,” NASA said.

“For core sampling, a sample tube is inserted inside the appropriate bit before the carousel moves the combination into position for the drill. Once the sample tube has been filled, the robotic arm returns the drill bit and tube to the carousel, where they wend their way to processing stations and storage,” NASA added.

35 Comments

35 Comments

  1. Pingback: He help 롤 강의 at Nebraska over 롤 대리 매물 yesterday.

  2. Pingback: guaranteed ppc reviews

  3. Pingback: live asian Sex chat

  4. Pingback: Plumber Near Me Mount Abundance

  5. Pingback: copy best iwc watch copies

  6. Pingback: wigs

  7. Pingback: dang ky 188bet

  8. Pingback: umbrella cockatoos birds for sale near me in usa canada uk australia europe cheap

  9. Pingback: 1betqq

  10. Pingback: imitacion relojes

  11. Pingback: w88

  12. Pingback: bitcoin evolution review

  13. Pingback: Pomeranian breeders

  14. Pingback: vaping products for sale online

  15. Pingback: Tree Removal call now

  16. Pingback: digital transformation

  17. Pingback: Sony KDL-43WE755 manuals

  18. Pingback: wigs for women

  19. Pingback: dumps pin sites

  20. Pingback: Devops

  21. Pingback: Buy Sex Toys Online

  22. Pingback: dumps pin shop 2021

  23. Pingback: sex on the beach drink mix

  24. Pingback: en iyi casino siteleri

  25. Pingback: digital transformation strategy

  26. Pingback: union cvv

  27. Pingback: อาหารหารเสริม Nona78

  28. Pingback: คาสิโนออนไลน์

  29. Pingback: cheap dumps store

  30. Pingback: psychedelic magic mushroom hunting

  31. Pingback: sbo

  32. Pingback: Henry Magnum Express 22WMR Lever-Action Rifle

  33. Pingback: was molly shannon on in living color,

  34. Pingback: สินเชื่อโฉนดที่ดิน

  35. Pingback: maxbet

Leave a Reply

Your email address will not be published.

19 − sixteen =

News is information about current events. News is provided through many different media: word of mouth, printing, postal systems, broadcasting, electronic communication, and also on the testimony of observers and witnesses to events. It is also used as a platform to manufacture opinion for the population.

Contact Info

Address:
D 601  Riddhi Sidhi CHSL
Unnant Nagar Road 2
Kamaraj Nagar, Goreagaon West
Mumbai 400062 .

Email Id: [email protected]

West Bengal

Eastern Regional Office
Indsamachar Digital Media
Siddha Gibson 1,
Gibson Lane, 1st floor, R. No. 114,
Kolkata – 700069.
West Bengal.

Office Address

251 B-Wing,First Floor,
Orchard Corporate Park, Royal Palms,
Arey Road, Goreagon East,
Mumbai – 400065.

Download Our Mobile App

IndSamachar Android App IndSamachar IOS App
To Top
WhatsApp WhatsApp us