Central Railway and Western Railway will conduct Mumbai Mega Block on most of the Sundays for the maintenance works of rail racks and other related works under both the Railway zones.
Central Railway’s Train Block is called Mega Block and Western Railway’s Train Block is called Jumbo Block
CENTRAL LINE
Mulund – Matunga Up Fast Line ( 11.15 AM – 3.45 PM )
All UP fast line services leaving Kalyan from 10.37 am to 3.06 pm will be diverted on Up slow line between Diva and Parel stations halting at all stations between Diva and Parel stations further will be diverted on Up fast line at Parel and will arrive destination 20 minutes behind schedule.
Dn fast/ Semi fast line services leaving CSMT Mumbai from 10.05 am to 3.22 pm will halt at Ghatkopar, Vikhroli, Bhandup, Mulund and Diva stations in addition to their respective scheduled halts and arrive destination 20 minutes behind schedule.
All Dn and Up slow line services leaving/arriving CSMT Mumbai between 11.00 am and 6.00 pm will arrive destination 10 minutes behind schedule.
Up Mail/ Express trains for Dadar and CSMT Mumbai leaving Thane after 10.50 am will be diverted on Up slow line between Mulund and Matunga stations and arrive destination 20 minutes behind schedule.
TRANS – HARBOUR LINE
Up And Dn Services Between Thane And Vashi/Nerul ( 11.10 AM TO 3.40 PM)
Dn Trans harbour line services to Thane to Vashi leaving Thane from 10.35 am to 4.07 pm and Up Trans harbour line services towards Thane leaving Vashi from 10.45 am to 3.38 pm will remain suspended between Thane and Vashi. During the block period, no Up and Dn services will be available on Thane-Vashi/Nerul/Panvel section.
Trans-Harbour line passengers are permitted to travel via Harbour line / Main line during the block period
HARBOUR LINE
There will be no Mega Block on Harbour line on 28.10.2018.
WESTERN LINE
No Day Block On This Sunday (Midnight OF 27th and 28th October, 2018)
Vasai Road – Vaitarna Stations (UP Fast Line – 11.50 PM – 02.50 AM) and (DOWN Fast Line – 01.25 AM – 04.25 AM )
To carry out maintenance work of tracks, signaling and overhead equipment, a block of THREE hours each will be undertaken from 23.50 hrs to 02.50 hrs on UP Fast Line and from 01.25 hrs to 04.25 hrs

Pingback: 메이저카지노
Pingback: 메이저카지노
Pingback: asigo system reviews 2020
Pingback: كلمات اغاني
Pingback: دردشة
Pingback: cash-bitcoin.com
Pingback: Vape Shop
Pingback: danh lo de
Pingback: click here
Pingback: Eat Verts
Pingback: cheap sensationnel wigs
Pingback: nằm mơ thấy kim cương
Pingback: best site to buy dumps
Pingback: Functional Testing Solutions
Pingback: online ERP Software services in Canada
Pingback: replica watches
Pingback: RED BULL
Pingback: buy track1,2 + pin
Pingback: 메이저놀이터
Pingback: cbd for anxiety stress
Pingback: newest sex dolls soft joints
Pingback: Digital Transformation Solutions
Pingback: Concrete company Chesapeake VA
Pingback: sex education in the united states of america
Pingback: https://www.sellswatches.com/
Pingback: Skywalker og
Pingback: Containerization Tools in Devops
Pingback: microsoft exchange activesync
Pingback: dark0de url
Pingback: White Runtz strain
Pingback: Generic Adderall
Pingback: Is there a difference between CBD for dogs and humans? - Quora
Pingback: คาสิโนออนไลน์เว็บตรง
Pingback: Real Ukraine Dating Agency
Pingback: DevOps as a Service