Nation

Fresh survey of Jagadhari-Paonta Sahib new railway line will be conducted: Railway Minister Piyush Goyal

Railway Minister Piyush Goyal has said that a fresh survey of Jagadhari-Paonta Sahib new railway line would be conducted with a focus on freight expected from industrial area Paonta Sahib very soon.
 
Addressing a press conference in Shimla today, the Minister said, study would also be carried out by RDSO to examine if Kalka-Shimla track could be strengthened to improve the speed of the trains plying on this track.
 
He stated that new Coaches of Kalka-Shimla Railway would be designed and manufactured to enhance the tourism experience. 
 
Union Railways Minister said, a budget allocation of 770 crore rupees has been made for infrastructure projects and safety works in the state in the budget for the year 2021-22. He said that this was 613 per cent more than the average allocation during the period 2009-2014.
 
Union Minister said that steps are also taken to expedite work on Bhanupalli-Beri and Chandigarh railway lines.
 
He said that the Chandigarh-Baddi railway line would go a long way in giving boost to industrial activities as the industrialists would be able to easily transport raw material as well as manufactured products in various destinations.

News is information about current events. News is provided through many different media: word of mouth, printing, postal systems, broadcasting, electronic communication, and also on the testimony of observers and witnesses to events. It is also used as a platform to manufacture opinion for the population.

Contact Info

West Bengal

Eastern Regional Office
Indsamachar Digital Media
Siddha Gibson 1,
Gibson Lane, 1st floor, R. No. 114,
Kolkata – 700069.
West Bengal.

Office Address

520, Asmi Industrial Complex, Near Ram Mandir Railway Station, Goregaon West, 400104, Mumbai, Maharashtra.

Download Our Mobile App

IndSamachar Android App IndSamachar IOS App
To Top
WhatsApp WhatsApp us